The project consisted of conservation and restoration works to a 19th Century, 28 metre high octagonal brick chimney structure and switch / generator building (which are protected structures) to the approval of the Conservation Officer. The electrical works required handling of high electrical content within a live hospital environment. These significant restoration works included the removal of existing roof structure; waterproofing and blocking up existing openings whilst maintaining appearance as requested by Conservation Architect.